Beamer-Lawson Indoor Practice Facility

大球场道530号
Beamer-Lawson Indoor Practice Facility
Beamer-Lawson Indoor Practice Facility

Everything about 弗吉尼亚理工大学’s Beamer-Lawson Indoor Practice Facility, from its color to its design features to its architectural touches, 说“Hokie.”

The facility is 210 feet wide and 400 feet long with a top-of-the-line synthetic turf.

The facility was renamed the Beamer-Lawson Indoor Practice Facility on Oct. 6, 2018 at a special halftime ceremony during 弗吉尼亚理工大学's game against Notre Dame.

The height from the playing surface to the bottom of the steel ceiling trusses is more than 86 feet at its apex, allowing plenty of room for punting and kicking. 它的8英尺厚的墙壁, 宽的间隙, 完整的记分板, and 40-second clocks on each end allow the football program to hold a full-contact scrimmage.

除了, the facility features garage-type doors, which open quickly and allow the players to move from the outdoor practice field into the indoor facility in inclement weather.

The facility also features a video platform that runs the length of the field. Three doors at separate locations lead out to observation decks to allow the video staff to film the outdoor portions of practice. Football coach Frank Beamer also has his own observation deck in the facility, with a door that leads to a deck outside for the observation of the outdoor portion of a practice.

The building has maroon trim and Hokie Stone on the bases of each support column. The archway entrance resembles that at Lane Stadium. +, the university’s core values – brotherhood, 荣誉, 领导, 牺牲, 服务, 忠诚, 责任和 Ut Prosim (That I May Serve) – are etched along the bases of the columns. Architects borrowed this feature from the Pylons above 战争纪念教堂.

The 体育运动 Department envisions men’s and women’s soccer, 垒球, 棒球, and lacrosse all using the building for training and conditioning purposes, particularly during inclement weather in late winter and early spring.

建筑历史

Former Athletic Director Jim Weaver identified a new practice facility as a need not long after being hired in the fall of 1997. In 1998, he received permission to build the facility from then-president Paul Torgersen, but other facilities needs took precedence at the time, putting the project temporarily on hold.

在接下来的十年里, the athletics department built the south end zone structure at Lane Stadium and then a new structure on the west side of the stadium. The department also constructed a basketball practice facility, 一个新的足球更衣室, a new Olympic sports weight room, and it embarked on several other smaller projects.

Movement on the practice facility project began again in earnest in 2012, but finding a site proved problematic as the university and the athletics department worked out issues related to finding a location.

2014年9月, a building and grounds committee of the Board of 访问ors approved the site with all sides coming to an agreement that the best place for the facility was on part of the existing football practice fields – specifically, the east practice field adjacent to the football locker room.

最初建立:
2015
映射网格:
N-8
缩写/编号:
Iatf / 186a
坐标:
37.222183, -80.417444